Independent Connection Provider (ICP) g2 Energy have secured works on a further industrial project in the North West of England. As well as completing the Contestable design works for the project, g2 Energy will also supply and install both the HV and LV cable, including all jointing, terminations, trenching and backfill.

g2 Energy will also be supplying and installing two 11kV package substations to be adopted by Independent Distribution Network Operator (IDNO) Eclipse Power Networks.

g2 Energy will provide Project Management on site as well as all As-Built documentation.

g2 Energy have the in-house resources to design, build and supply our clients with bespoke project solutions for High Voltage electrical grid projects. As a Lloyd’s accredited ICP we can provide Contestable Works to voltages up to 132kV.